School Infrastructure
Our target for first-year Kindergarten enrollment was a class of thirty students. In 2019, 47 students enrolled in Harvest school. As a result, an extension of the building complex should commence to fit our current and prospective students.
​
We need to build six more classrooms that will accommodate the growing student population. Based on our statistics, a lot of parents from nearby villages want to enroll their children because of our student's level of excellence.
The school compound still needs to meet the expected safety and hygiene standards. This includes a paved playground area and a secured fence around the school.
​
We have two basketball hoops with metal stands which we received as donations. We would love to introduce and involve the local youth in this sport. Currently, there are few sporting events organized for young demographics outside the school.
Inside Harvest kindergarten, our children have several donated small bicycles and mini cars which requires a smooth surface (the basketball court) to enjoy riding them.


The school is built on more than fifty-year-old uncultivated land and the soil on shoes is easily carried along especially during the rainy season.
Since there are no dirt-free spaces at the compound except inside the premises, the teachers and students coming from outside keep their shoes on when they are inside making the floor dirty with red dirt. They need to wear shoes because the floor is only concrete and has not been tiled yet.
During this season our staff and kids are more exposed to mosquitoes and snakes. Therefore, it is required to make our compound dirt, insects, and pest-free.
Things required for the initiation of the project:
​
-
Wood fencing on the boundary of the school compound.
-
Tiling on the floor of the classrooms.
-
Construction of a basketball court. playground, bike riding surface.
-
Cement, chippings, rental scaffolding, nails, wood for roofing, Iron rods, white sand, electrical wires, plumbing pipes and other electrical accessories.
-
Construction of new classrooms for grades 1 to 6.
To initiate this project we require funding for the following :
-
Consulting.
-
Construction materials.
The cost breakdown of this fundraiser can be found by following this link.
$746.15 Raised
4
Donation
$40,000
Goal
Project Progress

Updated on: 17th May 2023
5th April 2023 -The walls for classrooms and staff rooms have been erected, and workers have filled in the base for the school extension.
29th Mar 2023 - laid the foundation for the classrooms, and construction work is expected to commence soon.
29th Nov 2022 - Bricks made of cement, which will be used to build new classrooms.
​
20th Jan 2022 - Main hall and reception area tiles installation completed.
​
7th Nov 2021 - Trucks brought in the sand which will be used for the construction of new classrooms, toilets, and staff rooms.
​
15th Oct 2021 - Compound was cleared to avoid snakes and scorpions around the school.
​
10th July 2021 - K1 and k2 classroom and school entrance/reception area were painted along with part of our main hall space.
​
25th June 2021 - 50 logs of wood will be used for building new classrooms and staff-rooms. They will be left to dry for a few months and then peeled and treated before being used.
​
​